Skip to content
RESOURCES

TECHNICAL GUIDANCE

HANDS-ON ADVICE FROM PEOPLE WHO KNOW THE KIT.
Practical, technically sound guidance on inspection, calibration, NDT, structural assessment, and the day-to-day decisions that keep equipment compliant. Written for engineers, asset managers, maintenance leads, and anyone who has to make defensible decisions about whether equipment goes back into service.


NDT
CHOOSING THE RIGHT NDT METHOD

VT, UT, PAUT, MT, PT, RT, ET — which method suits which defect type, and when phased array adds value over conventional UT.

 

Learn more...

CALIBRATION
WHY VISIAL CHECKS ON INSULTATING GLOVES AREN'T ENOUGH

Air inflation testing, dielectric testing, and what Class 0–4 actually means — the standard your insurer expects.

 

Learn more...

NDT 
PHASED ARRAY UT VS CONVENTIAL UT

When PAUT is the right choice, what it adds in terms of defect characterisation, and when conventional UT is sufficient..

 

Learn more...

 


WELDING
HOW TO QUALIFY A WELDING PROCEDURE

The WPS, PQR, and welder record process under AS/NZS 1554 — what's required, who signs what, and what onsite testing actually involves.

 

Learn more...

EWP
WHAT TO LOOK FOR ON A 5-YEAR EWP MAJOR

The AS 2550.10 5-year major inspection scope — structural, mechanical, and electrical checks, plus the acoustic emission test on fibreglass booms.

 

Learn more...

PRESSURE EQUIPMENT 
PECPR INSPECTION SCOPE BY EQUIPMENT TYPE

What's in scope for pressure vessel, boiler, and pressure piping inspections under PECPR Regs 1999 — and what a compliant inspection report needs to contain.

 

Learn more...

GOT A TECHNICAL QUESTION?

Talk to a specialist who has actually done the work — not a sales rep reading from a script.

GET IN TOUCH 

Need support with calibration, certification, or compliance? Submit your enquiry and our expert team will respond with informed, accredited guidance—DEG is here to help.

 

Find us on social